55+ documented jobs completed across Melbourne, and every one of them is on this page. Street, suburb, the date we were there, and photographs taken on the job.

Filter by category


Two hundred square metres of roof on Rockbrook Road, carrying enough moss to change its colour from the street.
Read case study

The driveway and paving at the same South Road house, done on the same day as the facade but recorded on its own because it is a different job on a different surface.
Read case studyA double-storey house on South Road, on the southern boundary of Brighton East, with around 800 square metres of beige render across its walls. The owner called about the facade rather than the roof: the house faces a main road, and the render had gone grey in a way that hosing it down had stopped fixing.
Read case studyA double-storey house on Holyrood Street being prepared for sale, booked through the agent rather than by the owner.
Read case study

A multi-storey townhouse on St Kilda Road, cleaned top to bottom in a single visit. Rope access was used for the polycarbonate roof, the upper render and the windows.
Read case studyHigh rise window cleaning at the View Hotel on Roy Street, Albert Park, carried out by rope access with a crew of three over four days.
Read case study

A long single-storey house on Hoddle Street in Elsternwick with around 80 metres of guttering and downpipes blocked with compacted soil. The full run was cleared with SkyVac vacuum equipment from the ground.
Read case studyThree residential towers on Gladstone Street, South Melbourne, between twenty-two and twenty-five storeys, with all external glazing cleaned by rope access over three weeks by a crew of four.
Read case study

An annual clean for a returning client on Wrexham Road, Windsor, done in the first week of August. The property is ringed by trees, so the gutters fill every year.
Read case study

Roof valleys on Narawong Road, Caulfield, packed solid with leaves after several years without a clean. A tree overhangs the roof and everything it drops had collected in the same two channels.
Read case study

Windows and skylights on St Helen's Road, Hawthorn East, done in July. The third job at this property inside a year, after the paving and then the gutters.
Read case studyFull-height sliding glass on Yarra Street, Abbotsford, still mid-build. Water had been running down the outside of the panes and drying there, leaving white mineral streaks from the head of the frame to the floor.
Read case study